Office Furniture Installation Services
Cotswold Services Removals Ltd handles office furniture installation for businesses across Cheltenham, Gloucestershire and the wider UK, as a standalone project or as the final stage of a full office move.
What We Install
We install commercial furniture, not flat-pack from a catalogue. Our installers work to your layout drawing, assemble each item on site and position it where your floor plan says it goes.
- Desks, height-adjustable workstations and bench systems
- Storage units, pedestals, cupboards and shelving
- Screens, partitions and acoustic dividers
- Operator chairs, meeting tables and conference furniture
- Breakout, reception and soft seating
- Monitor arms, cable trays and desk power modules
We also reconfigure furniture you already own, which is covered further down this page.
Once the install is finished, all packaging, cardboard and offcuts are cleared from site. Where the building has the collection facilities for it, cardboard and plastic film are separated for recycling rather than going into general waste.
Three Ways We Deliver and Install
Most office furniture installation projects run on one of three routes. We will tell you at quote stage which one suits your programme and your supplier arrangements.

1. Storage, Crate Hire, Distribution and Installation
For phased fit-outs and refurbishments, we hold furniture in secure storage until the site is ready, then distribute and install to your programme. Crate hire is available through our Antz Crate Hire UK partnership, which includes a 20 percent reduction for customers. This route suits projects where furniture arrives before the space is ready, or where installation runs in phases across floors or departments.

2. Direct-to-Site Delivery and Installation
Your supplier delivers straight to site and our crew takes it from the tail lift. We receive the delivery, check it against the order, offload, unpack and assemble to your layout drawings or site plan.
This is the simplest route if you already have a furniture supplier relationship and only need the installation handled properly.

3. Manufacturer-to-Warehouse Consolidation and Installation
Furniture from several manufacturers is delivered into our Tewkesbury warehouse, consolidated, checked and prepared, then transported to site on our own vehicles for one coordinated installation.
This is the route that saves the most disruption on larger fit-outs. Instead of five suppliers arriving on five different days and five sets of packaging piling up in your reception, the deliveries land with us, and your building sees one install.
Office Fit-Outs, Reconfiguration and Clearance
Not every installation starts with new furniture. A good portion of our commercial work is moving and rebuilding what a business already owns.
- Reconfiguration. Dismantling desks and storage, moving them within the building and rebuilding them into a new layout, usually when a team grows or a floor gets redesigned.
- Consolidation. Reworking an existing furniture set to fit a smaller or shared space after a downsize.
- Site clearance. Removing redundant desks, pedestals, screens and seating from the floor so the new layout has room to go in.
- Dilapidations support. Stripping a floor back before a lease ends, working alongside your fit-out contractor.
Get a Free Quote Today
A little preparation makes moving day far smoother. Our walks you through what to do and when, and there are more moving tips on our . When you are ready, and we will take it from there.
Installation in Practice: Cheltenham Town Centre Fit-Out
In early 2026 we completed a full furniture installation for a professional services firm relocating within Cheltenham town centre. The project involved:
- 34 desks and monitor arms, 6 meeting tables and 60 chairs across two floors
- Furniture received into our warehouse from two separate suppliers over a four-day window
- Access to the new premises restricted to a single goods lift and a 30-minute loading bay slot per delivery, so we ran two vehicle movements timed to those slots
- Installation completed over two days out of hours to avoid disrupting the building’s other tenants
- Full site clear-down on completion, with all packaging removed
The client’s facilities manager confirmed the workspace was ready for staff on day one of occupation.
Out-of-Hours Installations
Most of our commercial installs happen when your business is closed. Evenings, weekends and shutdown periods mean your team arrives to a finished floor rather than working around toolboxes and flat-pack cartons.
Out-of-hours work also solves the access problem in shared buildings, where loading bays, goods lifts and service corridors are booked out during trading hours. Tell us your preferred window when you request a quote and we will build the programme around it.
Commercial Installation Planning Checklist
A clear brief is the difference between a one-day install and a three-day one. Have as much of this ready as you can before your quote call or survey.
Layout and inventory
- Floor plan or layout drawing, even a marked-up sketch
- Furniture inventory with supplier order references
- Assembly instructions for system and flat-pack items
- A list of existing furniture being reused or cleared
- Any items being reused from another site or floor
Deliveries and access
- Delivery schedule and contact for each supplier
- Loading bay location, dimensions and any booking system
- Goods lift dimensions and weight limit, or stair access
- Parking and vehicle height restrictions at the site
- Floor protection for lobbies, lifts and finished flooring
Site and security
- Building hours and any out-of-hours or tenant restrictions
- Security sign-in, passes, inductions or escort requirements
- Named site contact who can approve final positioning
- Where cleared furniture and packaging can be staged
- Other trades on site that week, and who holds the programme
If you do not have all of it yet, that is normal. Send what you have and we will work through the gaps with you before the install date is set.
Why Businesses Choose Us for Office Furniture Installation
We are Move Assured accredited and a Checkatrade member, rated 5.0 on Google from 103 reviews. For a commercial installation, that record translates into these specifics:
- Our own fleet and our own crews. Vehicles run from our Cheltenham base with a warehouse and storage facility in Tewkesbury, so deliveries, consolidation and installation stay with one company rather than being subcontracted out.
- DBS-checked installers. Every crew member is DBS-checked, which matters when the install runs out of hours in an occupied building.
- Crews who work to drawings. Installers set positions against your floor plan and walk the floor with your site contact before leaving, rather than assembling to the nearest guess.
- Warehouse consolidation for multi-supplier projects. Deliveries from different manufacturers are received, checked and held until the site is ready.
- Insurance cover for commercial work. Goods-in-transit cover up to £50,000 and public liability cover up to £5 million are stated on our policy documentation. Raise any high-value or specialist items at quote stage so we can confirm what applies.
- One team, one point of contact. The same company handles the move, the install and the clear-down, so there is nobody to chase between trades.
We do not publish fixed prices for installation work, because scope, access and programme differ on every project. Send us your floor plan and inventory and we will come back with a clear quote.
Furniture Installation as Part of an Office Move
Installation is usually the last and most visible stage of an office relocation. Because we also carry out the move itself, we can dismantle furniture at the old premises, transport it and rebuild it to your new layout as one continuous project, with one crew and one point of contact from start to finish.
That avoids the familiar problem of a removals firm stacking desk components in the middle of the floor and leaving the assembly to your facilities team.
If you are relocating premises as well as installing furniture, start with our office removals and relocation service. For planning a business move end to end, our guide to planning an office move in Gloucestershire covers the sequence. You can also see the full range of removals and storage services we cover from Cheltenham.
Office Furniture Installation FAQs
Do you install flat-pack and system furniture?
Yes. We assemble flat-pack furniture, modular workstation systems and bench desking, along with storage units, screens and partitions. Share the manufacturer’s assembly instructions or specifications at quote stage and we will factor the build time into the plan.
Can you install furniture we bought from another supplier?
Yes. You do not have to buy furniture through us. We regularly install products delivered direct from manufacturers, dealers and office interiors companies, including multi-drop deliveries, and we can receive, unpack, assemble and position them to your layout.
Do you install office furniture outside Cheltenham and Gloucestershire?
Yes. Gloucestershire is our primary area, and we take on national projects through the warehouse consolidation route, where furniture is delivered to us and transported to site on our own vehicles. Send us the site postcode and we will confirm coverage.
Can you work outside office hours?
Yes. Most installations are scheduled for evenings, weekends or quieter periods so your business is not disrupted and staff arrive to a finished, ready-to-use space. Tell us your preferred window when you request a quote.
What access information do you need before the installation?
Loading bay dimensions and booking arrangements, goods lift size and weight limit, and any time restrictions on building access are the three that change the plan most. We confirm all three at survey stage, along with security sign-in and parking.
Can you reconfigure or move furniture we already have?
Yes. We dismantle, move and rebuild existing furniture into a new layout, whether you are growing a team, redesigning a floor or consolidating into a smaller space. This is often combined with our office removals service as a single project.
Do you remove the packaging and waste afterwards?
Yes. We clear all packaging, cardboard and offcuts on completion and take them off site, separating materials for recycling where the building’s collection facilities allow.
How much notice do you need for an installation?
Straightforward installs and reconfigurations can often be booked within a couple of weeks where we have crew availability. For larger multi-phase fit-outs, or jobs with tight out-of-hours windows, four to six weeks gives us room to programme vehicles, crew and supplier deliveries together.
Get a Free Installation Quote
Send us your floor plan, your furniture inventory and your access details, and we will come back with a clear quote and a realistic install programme.
